Update website to include link to team contract, google drive folder
Task Delegation
Ben - upload images, videos from lab 1
Katie - upload contract
Caroline - start on website, work on front page
Pablo - Start writeup for lab 1
We agreed on meeting times, started the new website, and constructed the team contract. We signed the contract and made it available on the website.
Website link was sent to the class instructor.
09/07/2018
Everyone was present at the meeting.
Agenda
Finish pictures on website
Make the video links look pretty :)
Task Delegation
Pablo - Pictures and video stuff
Katie - New website theme
Caroline- Pictures and video
Ben - add git hub link and image (Dabbing Squid)
We worked on posting information for lab 1 on the website. We added images and videos from our lab. We decided to use a new template for our website. We also added
a link to our github page on our homepage. Lab 1 is due at midnight.
09/14/2018
Agenda
Add Milestone result to the website
Check on how everyone is doing
Prepare for Lab 2
Task Delegation
Pablo - Write up line following procedure
Katie - Write up objective and result
Ben - Write up implementation of grid figure 8
Caroline - add pictures, video, and double check write up
09/21/2018
Agenda
Check in on lab 2
Clean up website
Task Delegation
Caroline and Pablo - Finish acoustic section of lab
Katie and Ben - Finish visual section of lab
09/28/2018
Agenda
Check in on lab 2
Check in on Milestone 2 and distribute tasks
Updated website
Integrate the audio and IR and line and wallfollowing
10/05/2018
Agenda
Update website and include pictures and audio for Lab 2
Finish up Milestone 2
Task Delegation
Caroline and Ben: combine the wiring for ffts
Katie and Pablo - combine line following, wall following, audio and IR codes
10/12/2018
Agenda
Finishing up Milestone 2
Meet in the lab to get last stuff done
Try to start lab 3
10/19/2018
Agenda
Still working on Milestone 2 - ask for extension
Finish up Milestone 2 and lab 3
Meet on weekend to finish Lab 3 after asking for extension
Task Delegation
Caroline and Ben - Finish up Milestone 2
Katie and Pablo - Work on Lab 3
10/26/2018
Agenda
Starting lab 4
Update website for lab 3 and read about lab 4
Task Delegation
Caroline and Pablo - FPGA team
Katie and Ben - Arduino team
11/02/2018
Agenda
Still working on lab 4 and starting Milestone 3
PII and verilog file has been created and camera is almost finsished wiring
Task Delegation
Caroline and Pablo - figure out downsampling and M9k
Katie and Ben - Finish Camera set up and work on arduino code for register setting. Work on algorithm for Milestone 3
11/09/2018
Agenda
Gather information and update website for Milestone 3
M9K done. Still figuring out the downsampling
Camera setup and wiring finished. Some registers left to setup
Task Delegation
Katie and Ben: Update Milestone 3
Caroline and Pablo - Meet on weekend to figure things out for downsampling
11/16/2018
Agenda
downsampling code not working as expected
Register code ready for camera, not sure if correct
weekend meeting in lab
Task Delegation
Caroline and Pablo - correct downsampler, perform color bar test,and read pixels
Katie and Ben - Make sure registers are right and combine code for final competition
11/30/2018
Agenda
shape detection implementation works, color sensing also works
Practice run. Gary is moving in circles.
code combination is working but not including camera stuff yet, no IR detection and sound detection
Task Delegation
Caroline and Pablo - Update website with Lab 4 and Milestone 4
Katie and Ben - design for Gary and figure out why Gary is going in circles